Chapter 8. Cabling and connectivity
Cable Installation Planning
Before you place your cable order, consider your future growth needs. You
may wish to order cables longer than you need right now to avoid expansion
problems in the future.
As processor packaging evolves, internal locations for various cable
connections may shift, necessitating longer cables, even though the floor
locations of connected devices have not changed.
Following are:
v
A description of the IBM Site and Facilities Services.
v
A list of customer fiber optic cabling responsibilities if the services are not
elected.
v
A description of the z10 BC channel feature connections.
v
A description of the Fiber Quick Connect fiber harness feature for ESCON and
FICON cables.
Level 03c, May 2011
© Copyright IBM Corp. 2008, 2011
65
Содержание Z10 BUISNESS CLASS Z10 BC
Страница 1: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 2: ......
Страница 3: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 8: ...Level 03c May 2011 vi z10 BC IMPP...
Страница 10: ...Level 03c May 2011 viii z10 BC IMPP...
Страница 44: ...Level 03c May 2011 32 z10 BC IMPP...
Страница 50: ...Level 03c May 2011 38 z10 BC IMPP...
Страница 62: ...Level 03c May 2011 50 z10 BC IMPP...
Страница 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Страница 106: ...Level 03c May 2011 94 z10 BC IMPP...
Страница 110: ...Level 03c May 2011 98 z10 BC IMPP...
Страница 112: ...Level 03c May 2011 100 z10 BC IMPP...
Страница 116: ...Level 03c May 2011 104 z10 BC IMPP...
Страница 130: ...Level 03c May 2011 118 z10 BC IMPP...
Страница 131: ......
Страница 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...