Chapter 4. Guide for raised floor preparation
General information
This chapter provides recommendations and requirements for making the necessary
openings in the raised floor for installation.
The drawings on the following pages are intended only to show relative positions
and accurate dimensions of floor cutouts. They are
not
machine templates and are
not
drawn to scale.
Raised floor cutouts should be protected by electrically non-conductive molding,
appropriately sized, with edges treated to prevent cable damage and to prevent
casters from rolling into the floor cutouts.
Level 03c, May 2011
© Copyright IBM Corp. 2008, 2011
33
Содержание Z10 BUISNESS CLASS Z10 BC
Страница 1: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 2: ......
Страница 3: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 8: ...Level 03c May 2011 vi z10 BC IMPP...
Страница 10: ...Level 03c May 2011 viii z10 BC IMPP...
Страница 44: ...Level 03c May 2011 32 z10 BC IMPP...
Страница 50: ...Level 03c May 2011 38 z10 BC IMPP...
Страница 62: ...Level 03c May 2011 50 z10 BC IMPP...
Страница 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Страница 106: ...Level 03c May 2011 94 z10 BC IMPP...
Страница 110: ...Level 03c May 2011 98 z10 BC IMPP...
Страница 112: ...Level 03c May 2011 100 z10 BC IMPP...
Страница 116: ...Level 03c May 2011 104 z10 BC IMPP...
Страница 130: ...Level 03c May 2011 118 z10 BC IMPP...
Страница 131: ......
Страница 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...