I M P O R T A N T
The z10 BC is comprised of some of the most sophisticated and complex
electronic equipment ever integrated into one computer. As such, this
hardware needs to be protected from negative environmental impacts to
ensure the utmost reliability. One of the key factors affecting this reliability is
moving the system from the loading dock into the controlled environment of
your computer room on the day it is delivered.
To ensure that optimum environmental conditions are maintained, work with
your marketing representative to schedule the delivery at a time when you can
transport the system components from the point of delivery to the computer
room destination without unnecessary delay. Prompt handling upon arrival will
prevent any possibility of a problem caused by exposure to temperature
extremes, severe weather, or high humidity.
Level 03c, May 2011
Chapter 3. Models and physical specifications
17
Содержание Z10 BUISNESS CLASS Z10 BC
Страница 1: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 2: ......
Страница 3: ...System z10 Business Class Installation Manual for Physical Planning GC28 6875 03 Level 03c May 2011...
Страница 8: ...Level 03c May 2011 vi z10 BC IMPP...
Страница 10: ...Level 03c May 2011 viii z10 BC IMPP...
Страница 44: ...Level 03c May 2011 32 z10 BC IMPP...
Страница 50: ...Level 03c May 2011 38 z10 BC IMPP...
Страница 62: ...Level 03c May 2011 50 z10 BC IMPP...
Страница 86: ...LC Duplex Connectors ISC 3 Links ISC 3 Links FC 18 02 ISC 3 Level 03c May 2011 74 z10 BC IMPP...
Страница 106: ...Level 03c May 2011 94 z10 BC IMPP...
Страница 110: ...Level 03c May 2011 98 z10 BC IMPP...
Страница 112: ...Level 03c May 2011 100 z10 BC IMPP...
Страница 116: ...Level 03c May 2011 104 z10 BC IMPP...
Страница 130: ...Level 03c May 2011 118 z10 BC IMPP...
Страница 131: ......
Страница 132: ...Level 03c May 2011 Printed in USA GC28 6875 03...