Before
installing
the
storage
subsystem
in
the
cabinet,
ensure
that
there
are
no
obstructions,
either
in
the
cabinet
or
outside
the
cabinet,
that
would
make
ready
removal
and
replacement
of
any
of
the
components
impossible.
Check
for
obstructions
at
the
front
and
rear
of
the
cabinet.
Operational
Shock
The
DS4000
product
will
be
able
to
withstand
a
free-fall
drop
from
0.5
inches
onto
a
hard
surface.
Subjecting
the
equipment
to
a
single
shock
pulse
with
the
following
characteristics
will
simulate
this
level
of
shock:
Velocity
change
=
20
inches
per
second
;
Wave
form
=
Triangular,25g
@3.75
ms
Operational
Vibration
(Sweep)
While
in
its
normal
operating
position,
the
DS4800
will
continue
operating
when
subjected
to
the
following
vibration
sweep.
The
test
will
include
a
dwell
time
of
15
minutes
at
any
frequency
where
vigorous
or
resonant
excitation
occurs.
v
Frequency
sweep
=
5
Hz
–
150
Hz
–
5
Hz
v
Wave
form
=
Sinusoidal,
0.25g
Attention:
If
you
have
removed
the
components
from
the
DS4800,
you
should
be
able
to
lift
the
unit
from
the
shipping
box
and
into
the
cabinet
with
the
help
of
one
other
person.
(If
you
have
not
removed
the
components
before
the
installation,
you
should
have
at
least
two
other
people
available
to
help
you
lift
the
unit
from
the
shipping
box
and
into
the
rack
cabinet.)
For
safety
reasons,
IBM
does
not
recommend
moving
the
DS4800
Storage
Subsystem
from
the
shipping
box
and
installing
the
DS4800
on
the
support
rails
without
first
removing
all
CRU
components.
1.
Remove
the
empty
DS4800
Storage
Subsystem
from
the
shipping
box
and
set
the
storage
subsystem
in
the
cabinet.
shows
the
correct
orientation
of
the
empty
storage
subsystem
to
the
cabinet
and
support
rail.
The
following
steps
will
help
you
safely
install
the
DS4800
on
the
support
rails:
a.
If
you
have
installed
a
screw
in
the
upper
mounting
hole
at
the
front
of
each
support
rail,
remove
the
upper
screws.
These
two
screws
are
used
later
to
secure
the
front
of
the
storage
subsystem
to
the
rack.
b.
Move
the
empty
storage
subsystem
from
the
shipping
box
and
to
the
front
of
the
cabinet.
c.
With
help
from
another
person,
place
the
back
of
the
storage
subsystem
on
the
support
rails,
and
then
slide
the
storage
subsystem
into
the
cabinet.
Attention:
When
you
slide
the
storage
subsystem
into
the
cabinet,
verify
that
the
back
of
the
DS4800
Storage
Subsystem
is
secured
by
the
hold-down
clips
located
at
the
back
of
each
rail.
With
the
M5
rail
screws
loosely
threaded,
you
can
make
minor
adjustments
to
the
rails
to
ensure
that
the
subsystem
latches
in
the
hold-down
clips.
The
hold-down
clips
are
shown
in
Chapter
2.
Installing
the
storage
subsystem
43
Содержание TotalStorage DS4800
Страница 1: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 2: ......
Страница 3: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 18: ...xvi IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 168: ...140 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 216: ...188 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 220: ...192 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 240: ...212 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 246: ...218 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 249: ......
Страница 250: ...Part Number 22R6614 Printed in USA GC26 7845 01 1P P N 22R6614...