The
CD
also
includes
the
DS4000
Storage
Subsystem
controller
firmware.
Controller
firmware
version
6.23.xx.xx
or
higher,
which
supports
the
attachment
of
EXP810,
is
on
the
DS4000
Storage
Manager
version
9.23
release
1
CD
or
can
be
downloaded
from
the
IBM
support
Web
site
for
DS4000
storage
products:
www.ibm.com/servers/storage/support/disk/
Note:
Depending
on
your
DS4800
model,
you
may
need
to
purchase
the
appropriate
host
software
kit
for
your
host
server
operating
system.
Contact
your
IBM
representative
or
reseller
for
more
information.
5.
Continue
with
Preparing
the
site
The
floor
area
at
the
installation
site
must
provide
the
following
conditions:
v
Sufficient
space
to
install
the
DS4800.
v
Enough
stability
to
support
the
weight
of
the
fully
configured
DS4800
and
associated
systems.
A
fully
configured
DS4800
weighs
36.52
kg
(80.7
lb).
Ensure
that
all
requirements,
such
as
floor
space,
air
conditioning,
and
electrical
service,
have
been
met.
Other
site
preparation
activities
include
the
following
tasks:
v
To
ensure
that
there
is
enough
room
to
move
around
the
cabinet
and
install
modules,
clear
space
at
the
installation
area.
v
Install
uninterruptible
power
supply
(UPS)
devices.
v
If
applicable,
install
host
bus
adapters
(HBAs),
switches,
or
other
devices.
v
Route
interface
cables
from
the
hosts
or
switches
to
the
installation
area.
v
Route
main
power
cords
to
the
installation
area.
For
information
on
interface
cables
and
connections,
see
Continue
with
Preparing
the
rack
cabinet
Important:
Before
you
install
the
DS4800
in
a
rack
cabinet,
keep
in
mind
the
following
considerations:
v
Review
the
documentation
that
comes
with
your
rack
cabinet
for
safety
and
cabling
considerations.
v
Install
the
DS4800
in
a
recommended
22°
C
(72°
F)
environment.
v
To
ensure
proper
airflow,
do
not
block
the
air
vents;
at
least
15
cm
(6
in.)
of
air
space
is
required.
Review
the
important
information
in
v
To
ensure
rack
stability,
load
the
rack
cabinet
starting
at
the
bottom.
v
If
you
install
multiple
components
in
the
rack
cabinet,
do
not
overload
the
power
outlets.
v
Always
connect
the
storage
subsystem
to
a
properly
grounded
outlet.
v
Always
connect
the
IBM-certified
rack
power
distribution
units
(PDUs)
to
at
least
two
independent
power
circuits
or
sources.
Complete
the
following
steps
to
prepare
the
rack
cabinet
before
you
install
the
DS4800:
1.
Move,
unpack,
and
level
the
rack
cabinet
at
the
installation
site
(if
needed).
32
IBM
System
Storage
DS4800
Storage
Subsystem:
Installation,
User’s,
and
Maintenance
Guide
|
|
|
|
|
Содержание TotalStorage DS4800
Страница 1: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 2: ......
Страница 3: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 18: ...xvi IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 168: ...140 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 216: ...188 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 220: ...192 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 240: ...212 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 246: ...218 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 249: ......
Страница 250: ...Part Number 22R6614 Printed in USA GC26 7845 01 1P P N 22R6614...