The
circuit
breaker
in
the
DS4800
RAID
controller
that
the
power
supply
and
fan
unit
is
linked
to
has
not
been
tripped.
(The
right
power
supply
and
fan
unit
is
linked
to
controller
A;
the
left
power
supply
and
fan
unit
is
linked
to
controller
B.)
See
If
the
problem
persists
after
you
have
checked
the
above,
contact
your
IBM
service
representative.
14.
Remove
the
antistatic
protection.
15.
Install
the
front
bezel
by
aligning
the
pins
on
the
storage
subsystem
chassis
with
the
spring-steel
retainers
on
the
cover,
and
then
press
the
cover
toward
the
chassis
until
the
pins
snap
into
place.
16.
Use
the
DS4000
Storage
Manager
Subsystem
Management
window
to
check
the
status
of
components
in
the
storage
subsystem.
17.
Do
any
storage
subsystems
have
a
fault
(Needs
Attention)
status?
v
Yes
–
Select
the
Recovery
Guru
toolbar
button
in
the
Subsystem
Management
window,
and
complete
the
recovery
procedure.
If
the
problem
persists,
contact
your
IBM
service
representative.
v
No
–
Go
to
step
18.
Use
the
DS4000
Storage
Manager
client
software
to
a
new
storage
subsystem
profile.
Replacing
the
interconnect-battery
unit
Use
the
following
procedure
to
replace
the
interconnect-battery
unit.
Attention:
Never
remove
the
interconnect-battery
unit
unless
directed
to
do
so
by
an
IBM
service
representative.
In
addition,
do
not
replace
the
interconnect-battery
unit
in
any
of
the
following
situations:
v
The
DS4800
controller
A
is
not
in
optimal
state.
v
The
FC
paths
from
the
hosts
to
the
host
ports
in
controller
A
are
not
optimal.
v
The
drive
paths
from
controller
A
to
the
storage
expansion
enclosures
are
not
optimal.
v
The
right
power
supply
and
fan
unit
is
not
powered
on
or
not
optimal.
The
reason
not
to
replace
the
interconnect-battery
unit
in
any
of
the
above
situations
is
because
controller
A
is
the
designated
controller
to
receive
all
I/Os
when
the
interconnect-battery
unit
is
removed
from
the
DS4800.
Use
the
DS4000
Storage
Manager
client
Subsystem
Management
window
and
the
appropriate
SAN
monitoring
tools
to
ensure
that
there
are
no
problems
with
controller
A
or
with
the
connection
from
the
host
to
controller
A.
Also
note
that
LUN
Failover
between
controllers
is
disabled
during
this
procedure
because
controller
B
must
be
placed
offline
before
the
interconnect-battery
unit
is
removed
from
the
DS4800.
It
is
recommended
to
perform
the
interconnect-battery
unit
replacement
procedure
during
off-peak
I/O
traffic
hours.
Before
removing
the
interconnect-battery
unit,
you
must
use
the
DS4000
Storage
Manager
client
to
place
controller
B
offline.
Controller
A
must
display
Optimal
status
before
removing
the
interconnect-battery
unit.
Do
not
remove
the
interconnect-battery
unit
if
controller
A
does
not
display
Optimal
status.
156
IBM
System
Storage
DS4800
Storage
Subsystem:
Installation,
User’s,
and
Maintenance
Guide
Содержание TotalStorage DS4800
Страница 1: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 2: ......
Страница 3: ...IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide GC26 7845 01...
Страница 18: ...xvi IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 168: ...140 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 216: ...188 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 220: ...192 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 240: ...212 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 246: ...218 IBM System Storage DS4800 Storage Subsystem Installation User s and Maintenance Guide...
Страница 249: ......
Страница 250: ...Part Number 22R6614 Printed in USA GC26 7845 01 1P P N 22R6614...