6.
Move cable management arm up
a.
Pull out the retention pins (B) and rotate the cable management arm up on the pivot point (A)
from position (2) to position (1).. The pins will automatically retract into the locking position
when the arm is properly located in the up position.
A
B
1
2
7.
Remove all PCI cables
4
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...