Table 5. Two Node Configuration SMP Cabling
Cable Number
Cable Type
From: (U-Loc)
To: (U-Loc)
1
1.5 m (4.9 ft) SMP Cable
U2: P1-T3
U4: P1-T1
2
1.25 m (4.1 ft) SMP Cable
U2: P1-T1
U4: P1-T3
3
1.25 m (4.9 ft) SMP Cable
U2: P1-T2
U4: P1-T2
4
1.25 m (4.9 ft) SMP Cable
U2: P1-T5
U4: P1-T5
5
1.25 m (4.9 ft) SMP Cable
U2: P1-T6
U4: P1-T4
6
1.5 m (4.9 ft) SMP Cable
U2: P1-T4
U4: P1-T6
Note: U2 is System Node 1 and U4 is System Node 2.
c.
If you have a three node system configuration, use the diagram and the Three Node Configuration
SMP cabling table below to determine point-to-point cabling for SMP cables.
Table 6. Three Node Configuration SMP Cabling
Cable Number
Cable Type
From: (U-Loc)
To: (U-Loc)
1
1.5 m (4.9 ft) SMP Cable
U2: P1-T3
U5: P1-T1
2
1.25 m (4.1 ft) SMP Cable
U4: P1-T1
U5: P1-T3
38
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...