B
A
12.
Transfer the system node onto the extended slide rails
Note:
With the help of another SSR, follow the procedure below if lift tool and ladders were used to
remove the system planar from a height above 29U, otherwise skip to the next step.
Note:
Ensure both SSRs are wearing hard hats.
a.
Remove any obstacles (cables, packing material, tools, parts, etc.) that may interfere with the
transfer.
b.
Position the rear of the system node in front of the rack.
c.
Identify the three (3) guide pins on each side of the system node and the corresponding slots on
the slide rails.
d.
Position the system node on the tilt table, so that the tilt table handle is at the front of the system
node.
e.
Left side of system node should align with the left side of the tilt table.
Note:
Ensure the rack slide rails are pushed in completely and out of the way when you are
moving the ServerLIFT.
f.
Release the stabilizer brake, then move the ServerLIFT to the front of the rack.
g.
Rotate the ServerLIFT winch handle clockwise to raise the platform until the three (3) guide pins
are just above the height of the slide rails.
h.
Adjust the lift to ensure the system node is centered between the two rails when they are
extended.
i.
Position the system node to have the left side edge (A) aligned with the left edge of the tilt table.
j.
Extend the handle on the tilt table (B) then rotate handle clockwise to tilt the front up.
Note:
Ensure that the rear pair of guide pins will completely engage the rear slide rail slots when
the platform is slightly lowered, but before the middle pair starts to engage.
k.
Release the slide latches and carefully pull the slides outward until the rails are fully extended.
28
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...