c.
Label the SMP cables so they may be plugged back into the same slots.
d.
Grip the pull tab and pull in the direction indicated to remove the SMP cables.
9.
Remove all clock card cables
a.
Make note of the location from which each clock card cable is removed. They must be plugged
into the same location when reinstalled.
6
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...