a.
Make note of the location from which each PCI cable is removed. They must be plugged into the
same location when reinstalled.
b.
Label and unplug the PCI cables from the system node being serviced.
8.
Remove all SMP cables
a.
Make note of the location from which SMP cable is removed. They must be plugged into the
same location when reinstalled.
b.
Use the torque tool (41V1059) and turn in the direction indicated to unlock. There is a stop to
prevent over rotation. Visually confirm that the SMP cable camming mechanism is in the
unlocked position and that the black dots are showing through the two holes at the 5 and 11
o'clock positions before pulling on the cable.
Remove SCM
5
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...