Note:
Some pictures in the procedure from this step onward show the node on slide rails. This
should be ignored because the system has been removed from the rails and is positioned on the
lift tool.
14.
Remove Top Cover
Note:
The following steps apply only to the system node being serviced.
a.
Lift up the cover latch.
b.
Lift the cover off the system.
10
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...