arm is properly located in the down position.
A
B
1
2
20.
Plug in line cords
a.
Plug the line cords into the node being serviced.
21.
If an S-Biner power cable routing clip was previously removed:
While keeping the power cable
correctly routed through the S-Biner, clip all S-Biners to the node being serviced.
44
Power Systems: SCM
Содержание SCM
Страница 1: ...Power Systems SCM IBM ...
Страница 2: ......
Страница 3: ...Power Systems SCM IBM ...
Страница 4: ...ii Power Systems SCM ...
Страница 22: ...18 Power Systems SCM ...
Страница 52: ...48 Power Systems SCM ...
Страница 53: ......
Страница 54: ...IBM Printed in USA ...