If
Then
Yes:
Continue with the next step.
No:
This ends the procedure.
4.
Verify that the BMC network settings are correct.
a.
Power on the system by using the power button on the front of the system. Wait 1 - 2 minutes for
the system to display the Petitboot menu.
b.
When the Petitboot menu is displayed, press any key to interrupt the boot process. Then, select
Exit to Shell.
c.
Type the following command and press Enter:
ipmitool lan print 1
d.
Verify that the MAC address and the IP address settings are correct. Then, continue with the next
step.
Note:
If the IP address setting is incorrect, go to Configuring the firmware IP address
website(http://www.ibm.com/support/knowledgecenter/linuxonibm/liabw/
liabwenablenetwork.htm). If the MAC address is 00:00:00:00:00:00, go to “Contacting IBM service
and support” on page 110.
5.
Complete the following actions:
a.
Power on to the Petitboot menu.
b.
Use the BMC to update the system firmware. For instructions, see Updating the system firmware
by using the BMC.
Are you able to access the BMC?
If
Then
Yes:
This ends the procedure.
No:
Continue with the next step.
6.
Complete the service action that is indicated for your system:
v
If your system is an 8335-GCA or 8335-GTA, replace the system backplane. Go to “8335-GCA and
8335-GTA locations” on page 111 to identify the physical location and the removal and replacement
procedure. This ends the procedure.
v
If your system is an 8335-GTB, replace the BMC card. Go to “8335-GTB locations” on page 121 to
identify the physical location and the removal and replacement procedure. This ends the
procedure.
v
If your system is an 8348-21C, replace the system backplane. Go to “8348-21C locations” on page
133 to identify the physical location and the removal and replacement procedure. This ends the
procedure.
Resolving a power problem
Learn how to identify the service action that is needed to resolve a power problem.
1.
Is the amber LED of a power supply on solid and is the amber LED on the front of the system turned
off?
If
Then
Yes:
Ensure that the power cords for both power supplies are fully seated and that the power
distribution units (PDUs) and power outlets are supplying electricity. This ends the
procedure.
No:
Continue with the next step.
Beginning troubleshooting and problem analysis
3
Содержание Power System 8335-GCA
Страница 2: ......
Страница 16: ...xiv Problem analysis system parts and locations for the 8335 GCA 8335 GTA 8335 GTB and 8348 21C ...
Страница 133: ...System parts Figure 6 System parts Finding parts and locations 117 ...
Страница 160: ...144 Problem analysis system parts and locations for the 8335 GCA 8335 GTA 8335 GTB and 8348 21C ...
Страница 172: ...156 Problem analysis system parts and locations for the 8335 GCA 8335 GTA 8335 GTB and 8348 21C ...
Страница 173: ......
Страница 174: ...IBM ...