Option
installation
guidelines
Before
you
begin
to
install
options
in
the
BladeCenter
T
unit,
read
the
following
information:
v
Read
the
safety
information
beginning
on
page
vii
and
the
guidelines
in
“Handling
static-sensitive
devices”
on
page
17.
This
information
will
help
you
work
safely
with
your
BladeCenter
T
unit
and
options.
v
Blue
on
a
component
indicates
touch
points,
where
you
can
grip
the
component
to
remove
it
from
or
install
it
in
the
server,
open
or
close
a
latch,
and
so
on.
v
Orange
on
a
component
or
an
orange
label
on
or
near
a
component
indicates
that
the
component
can
be
hot-swapped,
which
means
that
you
can
remove
or
install
the
component
while
the
BladeCenter
T
unit
is
running.
(Orange
can
also
indicate
touch
points
on
hot-swap
components.)
See
the
instructions
for
removing
or
installing
a
specific
hot-swap
component
for
any
additional
procedures
that
you
might
have
to
perform
before
you
remove
or
install
the
component.
v
You
do
not
have
to
disconnect
the
BladeCenter
T
unit
from
power
to
install
or
replace
any
of
the
hot-swap
modules
in
the
BladeCenter
T
unit.
You
must
shut
down
the
operating
system
and
turn
off
a
hot-swap
blade
server
on
the
front
of
the
BladeCenter
T
unit
before
removing
the
blade
server,
but
you
do
not
have
to
shut
down
the
BladeCenter
T
unit
itself.
v
For
a
list
of
supported
options
for
your
server,
go
to
http://www.ibm.com/pc/compat/.
System
reliability
considerations
To
help
ensure
proper
cooling
and
system
reliability,
make
sure
that:
v
Each
of
the
module
bays
on
the
front
and
rear
of
the
BladeCenter
T
unit
has
either
a
module
or
filler
module
installed.
v
Each
of
the
blade
bays
on
the
front
of
the
BladeCenter
T
unit
has
either
a
blade
server
or
filler
blade
installed.
v
Each
of
the
drive
bays
in
a
blade
server
storage
expansion
option
has
either
a
hot-swap
drive
or
a
filler
panel
installed.
v
Each
of
the
PCI
slots
in
a
blade
server
PCI
I/O
expansion
option
has
either
a
PCI
adapter
or
a
PCI
filler
bracket
installed
v
A
removed
hot-swap
module
or
drive
is
replaced
within
1
minute
of
removal.
v
A
removed
hot-swap
blade
is
replaced
within
20
minutes
of
removal.
v
A
failed
blower
is
replaced
as
soon
as
possible,
to
restore
cooling
redundancy.
16
BladeCenter
T
Types
8720
and
8730:
Installation
and
User’s
Guide
Содержание BladeCenter T Type 8720
Страница 3: ...BladeCenter T Types 8720 and 8730 Installation and User s Guide ERserver...
Страница 8: ...vi BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 28: ...14 BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 64: ...50 BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 74: ...60 BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 88: ...74 BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 122: ...108 BladeCenter T Types 8720 and 8730 Installation and User s Guide...
Страница 127: ......
Страница 128: ...Part Number 88P9320 Printed in USA 1P P N 88P9320...