b. Using a screwdriver, tighten the screws that hold
the rear of the slide rails to the rear of the rack.
c. Release the server and pull the server forward
about half-way.
Note
To release the server, release the left and
right slide latches and pull the server
forward.
d. Using a screwdriver, tighten the screws that hold
the front of the slide rails to the front of the rack.
e. Slide the server into the rack enclosure again
until the slide latches on the front chassis
brackets click into place.
6. (Optional) For additional security, such as when
transporting the rack, fasten the server to the rack
enclosure by inserting a M6 by 16-mm screw through
the chassis bracket, mounting rail, and cage nut on
each side.
Netfinity 5600 - Type 8664
159
Содержание 866441Y - Netfinity 5600 - 8664
Страница 2: ......
Страница 8: ...vi Netfinity Server HMM...
Страница 168: ...7 To complete the installation refer to the documentation that comes with the rack enclosure 160 Netfinity Server HMM...
Страница 244: ...236 Netfinity Server HMM...
Страница 245: ...Related service information 237...
Страница 246: ...238 Netfinity Server HMM...
Страница 247: ...Related service information 239...
Страница 258: ...250 Netfinity Server HMM...
Страница 259: ...Related service information 251...
Страница 275: ......
Страница 276: ...IBM Part Number 09N1595 Printed in U S A S 9N 1595...