Page 4
9.4 System shut-down ............................................................................................................. 34
10. Diagnostics ...................................................................................................................... 35
10.1 System state .................................................................................................................... 35
10.2 Rest fault indication ......................................................................................................... 37
10.3 Involve HygroMatik service personnel ............................................................................. 37
11. Maintenance ..................................................................................................................... 38
11.1 Replacing the membrane ................................................................................................ 38
11.2 System separator: Maintaining and cleaning the cartridge ............................................. 41
11.3 Pressure regulator: inspect valve insert and strainer ...................................................... 42
11.4 Pressure regulator: replace backflow preventer .............................................................. 43
11.5 Pressure regulator functional check ................................................................................ 43
11.6 Drain valve functional check ............................................................................................ 43
11.7 Functional checks with pressure check equipment. ........................................................ 43
12. Placing out of operation and preservation ................................................................... 44
13. Spare parts ....................................................................................................................... 47
Содержание WL-RO-170
Страница 1: ...Reverse osmosis plants WL ROB 170 WL RO 170 WLROB170 ENx WLROB170 EN Manual...
Страница 21: ...Page 21 5 5 Dimension sheet Fig 3 Front Top view Permeate Connection R3 4...
Страница 22: ...Page 22 Fig 4 Lateral view Fig 5 Front view of securing and fixing plate Concentrate Hose 8 Wastewater drain...
Страница 46: ...Seite 46 This page intentionally left blank...