Page 27
7. Inital start-up (System was preserved by
manufacturer)
CAUTION!
Danger of material damage
The systems are factory preserved to protect the membrane
from germs.
•
During initial commissioning, the preservation solution
must be rinsed out and the permeate produced must be
directed into a waste water channel.
Before switching on the system, check and ensure that
•
only authorised persons remain in the work area of the
system
•
there is no visible damage: check mechanical and electri-
cal connections such as hose and screw connections and
cables. The system must not be switched on before any
damage detected is rectified.
•
no one can be injured by starting up the system.
Step
Action
1
Ensure that the permeate outlet is
not
connected to the system to be
filled.
The permeate produced during initial commissioning must be directed
into a waste water channel.
2
Open the shut-off ball valve on both the inlet and outlet side of the
combined system separator/pressure regulator.
3
Check the network cable for damage and
insert
the
mains plug
into a
power outlet.
The control device runs a self-test: the green and red LEDs briefly
flash yellow.
The green LED flashes.
The raw water inlet solenoid valve opens.
Содержание WL-RO-170
Страница 1: ...Reverse osmosis plants WL ROB 170 WL RO 170 WLROB170 ENx WLROB170 EN Manual...
Страница 21: ...Page 21 5 5 Dimension sheet Fig 3 Front Top view Permeate Connection R3 4...
Страница 22: ...Page 22 Fig 4 Lateral view Fig 5 Front view of securing and fixing plate Concentrate Hose 8 Wastewater drain...
Страница 46: ...Seite 46 This page intentionally left blank...