Page 48
Assembly
»
Insert the new flange sealing (15) in the groove of the
cylinder flange.
»
Put the cylinder halves together and connect them with
clamps (42).
»
Put the steam cylinder into the cylinder base (11).
»
Reattach steam hose and connections for level control.
»
Plug the 7-pin system plug for the electrical supply of
the steam cylinder into the plug connection.
»
Switch the power supply for the device back on.
Check the device for tightness after 15-30 minutes of operation.
In case of a leak, switch off the device with the control switch
and disconnect it from the voltage supply according to the safety
instructions. Subsequently repair the leak and switch the device
back on.
Cleaning of Steam Cylinder and Cylinder base
When using mineral deposit removers or cleaners to clean the
cylinder and heater elements, make sure you thoroughly rinse
the unit before returning reassembling it. Use mineral deposit
removers
only
for cylinder and heater elements.
Note:
Overly strong mechanical cleaning can damage the cylin-
der / heater elements.
»
Remove all deposits.
»
Cylinder base (11) and the connections have also to be
checked for deposits and cleaned if necessary.
Содержание HC02Kit
Страница 1: ...HCK END Electric Heater Steam Humidifier HeaterCompact Kit HCK END HCK EN Manual...
Страница 29: ...Page 29 Drill Pattern DN40 not to scale Note Due to variable print media the dimensions are not to scale...
Страница 59: ......
Страница 61: ...Page 61 12 Exploded View 27 2 28 29 15 30 42 9 13 41 30 31 3 12 7 5 6 16 8 21 17 14 32 10 18 40 11 23 22 43...