34
Connect new tubing from dosing pump to
chamber and secure with a cable tie.
Sidebag Vent Tubing Installation
Trim sharp edge with knife as shown below
Secure the tubing with a cable tie to the top of the
insulation by piercing two holes into the insulation
and routing the tie through the holes to hold the
tube. Do not over tighten leave the tubes fully
open.
Lube O-ring slightly with soapy water and
push
fitting
into
top
of
sidebag.
Note: Install new water inlet hoses and discard old hoses.
Hose to chamber
Sidebag Vent Hole
Cable Tie
Содержание L110W
Страница 1: ...Hydrim L110W Training Manual Training Manual ...
Страница 4: ...4 ...