Final Checks
Once the system is up and running,
it is the
responsibility of the installer
to see that all the
fine adjustments are made so the Scroll Plus™
Fibertronic™ delivers maximum temperature
performance and efficiency for the customer.
These include:
Defrost scheduling and timing
Condenser controls
Winter controls
Subcooling
EPR, ORI and CDA settings
TEV superheat adjustment
CPR settings
High and low pressure controls
Main liquid line solenoid differential
Thermostat settings
Adjustments to electronic controls.
Thoroughly inspect all field piping while the
equipment is running and add supports where line
vibration occurs. Be sure additional supports do
not conflict with pipe expansion and contraction.
When merchandisers are completely stocked
,
check the operation of the system again.
At 48 hours
of operation replace the liquid drier
and suction filter cores.
At 90 days
recheck the entire system, including
all field wiring. Change the oil filter using a
Sporlan SF-283-F. Future maintenance costs may
be reduced if an oil acidity test is run at this time.
Replace acid oil.
MAINTENANCE
Compressor Replacement
Since each machine room tends to be unique, plan
carefully as to how you will move the compres-
sors without harming personnel, equipment or
the building. Before beginning removal of old
compressor, make replacement unit ready to
install:
Verify
Replacement compressor
Electrical requirements
Refrigerant application
Capacity
Piping hookup location and design
Suction and discharge gaskets
Mounting requirements.
Have compressor in an easily accessible position,
uncrated and unbolted from shipping pallet.
Disconnect Electrical Supply
Turn off motor and control panel power supplies
to the Rack.
Turn off control circuit and open all compressor
circuit breakers.
Tag and remove electrical wires and conduit from
the compressor.
Isolate Compressor from Rack
Front-seat Suction and Discharge Service Valves.
Close oil supply and equalizing lines.
Bleed compressor pressure through both dis-
charge and suction access ports into an
approved
recovery vessel.
Remove oil supply and equalizing lines.
Remove externally mounted components which
will be re-used on the replacement compressor.
September 1, 1997
P/N 401789
8 - 5