1-4
I
nstallatIon
P/N 3053328_C
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
DOOR ADJUSTMENT
After leveling and joining the merchandisers,
adjust and level doors according to manufacturer’s
instructions shipped with each product. Factory
settings may be lost due to vibration during shipment.
INSTALLING SPLASHGUARD
BRACKETS
1. Attach splashguard retainer and splashguard
retainer support to splashguard support bracket
using two screws per bracket.
2. Install splashguard support brackets underneath
case
.
The leveling brackets have a maximum
extension of one (1) inch (25 mm) for uneven
floors.
DO NOT
place
shims
under
splashguard
brackeTs
.
NOTE: Install splashguard support brackets
before piping case.
JOINING
Sectional construction means that two or more
merchandisers may be joined in line yielding one long
continuous display requiring only one pair of ends.
Joining kits and instructions are shipped with each
merchandiser.
To join like fixtures, a joining kit is required. To
join unlike fixtures, or like fixtures operating at
different temperatures, a 2 inch (51 mm) partition kit
is required. To join same temperature merchandisers
on different defrost cycles, a plexiglass partition kit is
required.
a
ll
joinTs
musT
be
air
-
TighT
To
prevenT
formaTion
of
ice
or
condensaTion
.
Refer to the instructions on the next page.
Splashguard
Retainer Support
Splashguard
Support Bracket
Splashguard Retainer
Screw
Bumper Retainer
Screw
Base Rail