1-14
I
nstallatIon
P/N 3053328_C
U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM
Figure 7A. Joining Sequence
RL / RLN
7
Loosely insert
Cap Screw – 5
with
Lock Washer – 6
into each nut retainer
following the sequence shown in Figure 7A.
Do not tighten fully.
A. Fasten bottom fronts together, but
tighten only until front panels touch.
B. Move to the bottom back position and
join (2 places).
C. Join at the top front position.
D. Go to the middle back wall position and
join.
E. Join at the lower back wall.
F. Finally, join at the top back wall
position.
Following the same sequence, tighten each
cap screw fully until the merchandisers
are joined with a snug fit and gaskets are
compressed.
8
Refer to Section 1 of the Reach-In
Installation and Service Manual to install
splashguard brackets and bumpers.
Section 3 provides direction for installing
splashguards, including splashguard Splice
Connector – 8.
Nut Retainer
Alignment Pin