INSTALLATION
39
■
Continue with the stack on the right, and ensure the carriers have been traversed to the
right, and the free carriers in the front channel have been stacked to the right.
■
Locate the panel (you had previously set aside) marked “REAR PANEL — INSTALL FIRST.”
This is the first panel to install.
■
Locate the temporar y plastic fabric hanger installed in the headrail. You will install the
first panel into the same carriers. Remember the carriers into which the hanger is installed,
remove the temporary hanger. Twist it gently to remove.
■
With the front side of the rear panel facing you, insert the RIGHT side of the fabric hanger
into the carrier in the REAR channel (see No. 1).
■
If you have 17" panels, slide the center guide into the center channel in the headrail
(see No. 2).
■
Gently twist the fabric hanger inward and insert the LEFT side of the fabric hanger into the
carrier in the FRONT channel (see No. 3).
IMPORTANT:
After you have installed the first panel, verify that the flush end cap on the
bottom weight is on the LEFT side. The flat side of the bottom weight should face the room.
■
Continue installing panels, REAR channel first. The last panel you will install will be marked
“FRONT PANEL — INSTALL LAST.”
IMPORTANT:
This panel has two flush end caps on the bottom weight.
■
Test traverse (use the button on the receiver).
Front Channel
Rear Channel
Rear Carrier
Center Channel
Center
Guide
Front
Carrier
3.
Insert the left side of
the fabric hanger into
the front carrier.
2.
Put the center guide into
the center channel
(17" panels only).
1.
Insert the right side of
the fabric hanger into
the rear carrier.
Screw
Flush End Cap
Window
Room
Headrail (Top View)
Left Stack/Left Facing
Bottom Weight
Содержание Skyline PowerView
Страница 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Страница 58: ...Notes...
Страница 59: ......