INSTALLATION
34
■
Continue installing panels, rear channel first. The last panel you install will be marked
“FRONT PANEL — INSTALL LAST.”
IMPORTANT:
This panel has two flush end caps on the bottom weight.
■
Test traverse (use the button on the receiver).
Left Stack/Left Facing Assembly
IMPORTANT:
Use the button on the receiver to traverse the unit open and closed to test for
proper operation.
■
Use the button on the receiver to traverse the carriers to the stacked position.
■
Manually stack the free carriers in the front channel to the left end. Reposition these as
needed while installing each panel.
■
Locate the panel marked “REAR PANEL — INSTALL FIRST.” This is the first panel to install.
■
Locate the temporary plastic fabric hanger installed in the headrail. You will install the first
panel into the same carriers. Remember the carriers into which the hanger is installed,
remove the temporary hanger. Twist it gently to remove.
■
With the front side of the rear panel facing you, insert the RIGHT side of the fabric hanger
into the carrier in the REAR channel (see No. 1).
■
If you have 17" panels, slide the center guide into the center channel in the headrail
(see No. 2).
Front Channel
Rear Channel
Rear Carrier
Center Channel
Center
Guide
Front
Carrier
3.
Insert the left side of
the fabric hanger into
the front carrier.
2.
Put the center guide into
the center channel
(17" panels only).
1.
Insert the right side of
the fabric hanger into
the rear carrier.
Screw
Содержание Skyline PowerView
Страница 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Страница 58: ...Notes...
Страница 59: ......