INSTALLATION
37
■
With the front side of the rear panel facing you, insert the LEFT side of the fabric hanger
into the carrier in the REAR channel (see No. 1).
■
If you have 17" panels, slide the center guide into the center channel in the headrail
(see No. 2).
■
Gently twist the fabric hanger inward and insert the RIGHT side of the fabric hanger into the
carrier in the FRONT channel (see No. 3).
IMPORTANT:
After you have installed the first panel, verify that the flush end cap on the
bottom weight is on the LEFT side. The flat side of the bottom weight should face the
window.
■
Continue installing panels, REAR channel first. The last panel for the right stack will be
marked “FRONT PANEL — INSTALL LAST.”
IMPORTANT:
This panel has two flush end caps on the bottom weight.
■
Test traverse (use the button on the receiver).
Split Stack/Left Facing (Motor on the Left Only)
IMPORTANT:
Use the button on the receiver to traverse the unit open and closed to test for
proper operation.
■
Use the button on the receiver to traverse the carriers to the stacked position.
■
Manually stack the half of the free carriers in the front channel to the left end and the other
half to the right end. Reposition these carriers as needed while installing each panel.
Left Stack/Right Facing
Front Channel
Rear Channel
Rear
Carrier
Center
Channel
Center Guide
Front Carrier
1.
Insert the left side of
the fabric hanger into
the rear carrier.
2.
Put the center guide into
the center channel
(17" panels only).
3.
Insert the right side of
the fabric hanger into
the front carrier.
Flush End Cap
Window
Room
Headrail (Top View)
Left Stack/Right Facing
Bottom Weight
Содержание Skyline PowerView
Страница 1: ...Installation Operation Care Skyline Gliding Window Panels PowerView Motorization...
Страница 58: ...Notes...
Страница 59: ......