
UPS5000-S-880 kVA
User Manual (CMI)
3 Installation
Issue 02 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
56
Figure 3-10
Removing the switch extension rod
(1) Blue mark
Step 9
Install the soft copper bars between power cabinet 1 and its adjacent bypass cabinet.
1.
Cut off the cable ties bound between holes in soft copper bars numbered 23, 24, 25, 26,
and 30.
2.
Secure the soft copper bars numbered 23, 24, 25, 26, and 30 using M12x45 screws, as
shown in the following figure.