Configuration Files
l
Configuration file of Switch A
#
sysname SwitchA
#
vlan batch 10
#
interface Vlanif10
ip address 10.1.1.1 255.255.255.0
#
interface GigabitEthernet0/0/1
port hybrid pvid vlan 10
port hybrid untagged vlan 10
#
nqa test-instance admin icmp
test-type icmp
destination-address ipv4 10.1.1.2
#
return
l
Configuration file of Switch B
#
sysname SwitchB
#
vlan batch 10
#
interface Vlanif10
ip address 10.1.1.2 255.255.255.0
#
interface GigabitEthernet0/0/1
port hybrid pvid vlan 10
port hybrid untagged vlan 10
#
return
6.27.2 Example for Configuring the FTP Download Test
Networking Requirements
l
Switch B functions as the FTP server.
l
A user with the name
user1
and the password
hello
intends to log in to the FTP server to
download the
test.txt
file.
Figure 6-4
Networking diagram for configuring the FTP download test
SwitchA
SwitchB
GE0/0/1
VLANIF10
10.1.1.1/24
GE0/0/1
VLANIF10
10.1.1.2/24
FTP Client
Configuration Roadmap
The configuration roadmap is as follows:
Quidway S5700 Series Ethernet Switches
Configuration Guide - Network Management
6 NQA Configuration
Issue 01 (2011-10-26)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
336