NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
4 Commissioning
Issue 01 (2017-07-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
122
Figure 4-35
L1/L2/L3 current detection
Figure 4-36
Electric heater commissioning
Step 7
After the electric heater commissioning, the humidifier commissioning screen is displayed.
Verify that the main water inlet valve is open. Check whether the humidifier pipes and the
solenoid valve leak.
If yes, select
Leak
, and tap
Submit
. The commissioning has failed. Locate and repair the
leak points.
If no, select
No leak
, and tap
Submit
within the time limit displayed on the screen.
Содержание NetCol5000-A
Страница 264: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 265: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 266: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 267: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...