Installation Manual
iSiteC BTS3601C CDMA Base Station
Table of Contents
i
Table of Contents
2 Installing Cabinet Hardware...............................................................................................2-1
2.1 Hardware Components ..............................................................................................2-1
2.1.1 Component Structure .......................................................................................2-1
2.1.2 Introduction of Hardware Major Equipment ........................................................2-2
2.1.3 Introduction of Hardware Auxiliary Equipment ....................................................2-2
2.1.4 Installation Mode..............................................................................................2-3
2.1.5 Installation Flow...............................................................................................2-3
2.2 Installation Planning ...................................................................................................2-5
2.2.1 Example of Indoor Wall Installation....................................................................2-5
2.2.2 Example of Indoor Plinth Installation ..................................................................2-6
2.2.3 Example of Concrete Pole Installation ...............................................................2-6
2.2.4 Example of Metal Mast Installation on Building-top .............................................2-9
2.2.5 Example of Tower Installation .........................................................................2-11
2.3 Installing Major Equipment .......................................................................................2-13
2.3.1 Installation Flow.............................................................................................2-13
2.3.2 Installing BTS3601C on the Wall .....................................................................2-14
2.3.3 Installing BTS3601C on Plinth.........................................................................2-18
2.3.4 Installing BTS3601C on Metal Mast and Concrete Pole ....................................2-20
2.3.5 Installing Modules ..........................................................................................2-22
2.3.6 Installing Cables ............................................................................................2-24
2.3.7 Installing Shell ...............................................................................................2-30
2.3.8 Installing Sun-shading Cover ..........................................................................2-31
2.4 Installing Auxiliary Equipment ...................................................................................2-31
2.4.1 Installing IAFB ...............................................................................................2-32
2.4.2 Installing AC Lightning Protection Box .............................................................2-33
2.4.3 Installing UPS ................................................................................................2-39
2.4.4 Installing IABB ...............................................................................................2-39
2.5 Installing Cables ......................................................................................................2-47
2.5.1 Cable Connection Requirements .....................................................................2-48
2.5.2 Networking of AC Lightning Protection Box......................................................2-52
2.5.3 Networking of IAFB ........................................................................................2-55
2.5.4 Networking of Inverter ....................................................................................2-65