I n s t a l l a t i o n M a n u a l
i S i t e C B T S 3 6 0 1 C C D M A B a s e S t a t i o n
H a r d w a r e I n s t a l l a t i o n
1 I n s t a l l a t i o n P r e p a r a t i o n s
1 -1 0
(1) Foam plate
(2) Module
(3) Antistatic bag (4) Board box
(5) Pressure-sensitive adhesive tape (6) Packing tape (7) Carton
(8) Carton label
Figure 1-2
Unpacking of the module
Unpack the carton as follows:
1)
Check the type and quantity of the modules as per the carton label;
2)
Snip the packing tape using a pair of diagonal pliers;
3)
Rip the adhesive tape along the joint seams using a paper knife. Be careful not to
insert the knife too deep, avoiding damage to the modules;
4)
Unpack the carton and take out the foam plate;
5)
Check whether the quantity marked on the label of the module box is in
compliance with that on the carton label. If yes, take out the module box;
6)
Open the module box and take out the module from the antistatic bag.
Caution:
1) Anti-static measures should be taken when holding the modules;
2) When the module box is open, the module shall be seen wrapped in a packing bag and an antistatic bag.
Do not tear or discard these two bags, as they can be used to store the spare modules or to wrap the
failure modules for repair.