Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
3
Installing RF Antenna and Feeder System
3-7
(1)
330mm
(1) M8 bolt
Figure 3-8
Structure of the grounding copper bar
The installation is shown in Figure 3-9 and Figure 3-10.
(1)
(2)
(3)
(4)
(5)
(1) Nut M12
(2) Spring washer
v
12
(3) Large plain washer
(4) Insulation washer
(5) M12
%
80 exploded expansion bolt
Figure 3-9
Installing the grounding copper bar
(1)
(2)
(3)
(4)
(5)
(6)
Wall
(1) Nut M12
(2) Spring washer
v
12
(3) Large plain washer
(4) Indoor grounding copper bar
(5) Insulation washer
(5) M12
%
80 exploded expansion bolt
Figure 3-10
Sectional view of grounding copper bar installation
The insulation washer is shown in Figure 3-11.