Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
2
Installing Cabinet Hardware
2-4
Start
Install major
equipment
Plan
Install auxiliary
equipment
Hardware installation check OK?
End
Reinstall the
relevant part
N
Y
Install antenna and feeder
system
Install cables
Install GPS antenna and
feeder system
Figure 2-2
Hardware installation flow
I. Description
1)
Planning
You can start to install the BTS only after plans have been made for the installation
positions and cable distribution of all equipment, and relevant support equipment like
supports and masts have been prepared.
2)
Installing major equipment
BTS major equipment refers to the hardware equipment that accomplishes the major
functions of the BTS.
3)
Installing auxiliary equipment
BTS auxiliary equipment refers to the equipment that provides power and functions like
lightning protection and transmission for the major equipment of the BTS.