Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
2
Installing Cabinet Hardware
2-63
4)
IAFB networking (3 BTS3601Cs with UPS)
It is required to connect cables sent to the site according to labels on them, the
connection correspondence shown in Figure 2-61 and Figure 2-62, and the
correspondence between labels and cables described in Table 2-6.
Figure 2-61
Cable distribution in IAFB networking (3 BTS3601Cs with UPS)