Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
2
Installing Cabinet Hardware
2-20
1) Installation hole
2) M10
%
50 bolt
3) Plinth
Figure 2-17
Securing rack onto plinth
Caution:
Check the levelness of the rack after the installation and confirm the result not over 1° so as to ensure the
cooling of the MPAM. Otherwise, adjust it till it is OK.
2.3.4 Installing BTS3601C on Metal Mast and Concrete Pole
I. Installing fastener sets
This installation mode comprises BTS3601C installation on metal masts and poles. To
fix the rack onto them, fastener sets should be installed first.