Installation Manual
iSiteC BTS3601C CDMA Base Station
Hardware Installation
2
Installing Cabinet Hardware
2-43
Caution:
The proper length of the hole should be 55mm~65mm. Otherwise, the expansion bolt cannot be
completely driven into the hole, which affects the reliability of the box.
5)
Put in turn spring washers, and plain washers onto 4 M12
%
60 bolts, and pull 4
bolts through the holes at the bottom of the support, then put expansion sleeves
and nuts onto the bolts. And then put the bolts into the holes made on the concrete
floor and tighten the bolts with a spanner, as shown in Figure 2-43. Therefore, the
box is secured on the floor.
1) Spring washer
2) Plain washer
3) Expansion bolt
4) Expansion sleeve
5) Bolt
6) Support
7) Box
Figure 2-43
Fixing the box onto the concrete floor
6)
Open the door of the box and place the batteries into the box. The box comprises
three layers, each of which can hold two batteries.
7)
Connect 6 batteries in series via the cables delivered with the box, as shown in
Figure 2-44.