FusionModule5000 Smart Modular Data Center
Commissioning Guide
6 Commissioning the Management System
Issue 06 (2020-03-20)
Copyright © Huawei Technologies Co., Ltd.
80
Path
Parameter
Default
Value
Setting
Password
include at least three of the
following types: lowercase
letters, uppercase letters,
digits, and special characters)
Confirm
authentication
password
N/A
N/A
Step 5
Click
Submit
.
----End
6.6.4.3 Creating an ECC800 on the NetEco
Prerequisites
You have logged in to the NetEco client by web browser.
You have created modules or container in
Data Center Planning
.
Context
For detailed operations, see
iManager NetEco 6000 Device Installation and Commissioning
Guide
of the corresponding version.
Procedure
1.
Choose
System
>
Configuration Management
>
Data Center Planning
from the main
menu. The
Data Center Planning
window is displayed.
2.
Click
in the upper left area of the
Data Center Planning
window to switch to the
Uncreated Device Information
window.
3.
Click
in the
Uncreated Device Information
window to switch to the
Add Device
window. You can add an ECC800 device to the specified modular in the
Add Device
window. For detailed operations, see