FusionModule5000 Smart Modular Data Center
Commissioning Guide
6 Commissioning the Management System
Issue 06 (2020-03-20)
Copyright © Huawei Technologies Co., Ltd.
63
Path
Operation
Parameters
Set
Route 2 Control Mode
to
PAD
Charging
, and click
Submit
.
NOTE
If two AC actuators are configured, you only
need to set the
Route 2 Control
Mode for one
AC actuator.
Step 3
Check the functions of the AC actuator.
Table 6-6
Function commissioning
Check Method
Normal Connection Status
Path:
Monitoring
>
Aisle
>
AC
Actuator Group
>
AC
Actuator n
1.
Choose
Running
Parameters
, set
Set light
mode
is
Manual
.
2.
Choose
Controls
, select
Light control
, select
ON
,
and click
Submit
.
The light is on.
When the light is normal, set
Set light mode
to
Automatic
. Path:
Monitoring
>
Aisle
>
AC Actuator Group
>
AC Actuator
.
----End
6.6 Feature Commissioning
Certain features described in this chapter have been commissioned in the Opening Guide, so
you can skip them based on the actual situation.
6.6.1 Fire Linkage
Prerequisites
You have obtained the IP address of the ECC800 as well as the user name and password
used for WebUI login.
A PC with an IP address in the same network segment as that of the ECC800 is prepared,
and the PC has connected to port WAN_1 on the ECC800.
Ensure that
Enable linkage control function
is
Yes
.