FusionModule5000 Smart Modular Data Center
Commissioning Guide
3 Preparations for Power-On Commissioning
Issue 06 (2020-03-20)
Copyright © Huawei Technologies Co., Ltd.
15
3
Preparations for Power-On
Commissioning
3.1 Personnel Skill Requirements
Table 3-1
Personnel Skill Requirements
Personnel
Skill Requirements
Supervisor
Must be familiar with the configurations of the power supply and
distribution system, cooling system, and management system as well
as the operations for each core component, and must gain the
qualification from Huawei.
Construction
personnel
Must have the electrician certificate and welder certificate.
3.2 Tools
To ensure smooth power-on commissioning, prepare the tools listed in the following table.
Insulate installation tools to prevent electric shocks.
Table 3-2
Tools
Tools
Phillips screwdriver
Flat-head screwdriver
Utility knife