
04/2013
2.990.999.120_en
35
SP 5080
4.3 Initial
start-up
– Open the inspection door on the hopper and check that the press chamber is clear, and re-
move any spare parts or supplies delivered with the machine
– Insert the CEE Plug into the socket on site.
– Activate the emergency stop control by pushing the switch bar away from the machine.
– Unlock the emergency stop on the press. (optional).
– Switch on the main switch of the press and the shredder.
•
After a self-test by the control, the
Indicator: Manual mode – Initial position,
appears
–
If the error number 1000 (= phase is absent) or 1010
(= counter-clockwise phase rotation) appear in the display -> call an electrician!
See also the “Malfunctions” section
Warning!!
Faults in electrical components and supply cables may only be attended
to by qualifi ed electricians or HSM service engineers.
–
Close the control cabinet, before continuing to commission the machine.
–
Set the desired user language
Содержание SP 5080
Страница 18: ...18 2 990 999 120_en 04 2013 SP 5080 2 7 Machine dimensions 2 x1 5 kN 2 x1 5 kN 2 x2 3 kN 2 x2 3 kN ...
Страница 38: ...38 2 990 999 120_en 04 2013 SP 5080 1 2 3 4 5 6 7 8 ...
Страница 55: ...04 2013 2 990 999 120_en 55 SP 5080 9 Electrical circuit diagrams Electrical plan is separate in the press ...
Страница 56: ...56 2 990 999 120_en 04 2013 SP 5080 10 KP 80 hydraulic diagram ...