
04/2013
2.990.999.120_en
21
SP 5080
3.6
Transporting the shredder
Caution!
When moving the shredder, note that it may topple over. Danger of falling
over!
– Place the shredder on a smooth level surface at the installation site.
– Remove the packaging foil and dispose of it in a manner that is environmentally
sound.
– Cut through the steel straps.
– Roll the shredder off the pallet in accordance with the unpacking instructions. The
shredder can now be moved on its rollers.
• The loading table must be mounted at the installation site.
Содержание SP 5080
Страница 18: ...18 2 990 999 120_en 04 2013 SP 5080 2 7 Machine dimensions 2 x1 5 kN 2 x1 5 kN 2 x2 3 kN 2 x2 3 kN ...
Страница 38: ...38 2 990 999 120_en 04 2013 SP 5080 1 2 3 4 5 6 7 8 ...
Страница 55: ...04 2013 2 990 999 120_en 55 SP 5080 9 Electrical circuit diagrams Electrical plan is separate in the press ...
Страница 56: ...56 2 990 999 120_en 04 2013 SP 5080 10 KP 80 hydraulic diagram ...