Periodic maintenance 74
Component to be inspected
Task
Frequency
Capable Party
—
Compare the following with site
indications (if available):
•
CWS/CWR temperature
•
CWS/CWR pressure
•
Flow rate (if possible)
(Investigate discrepancies, trouble
shoot, and replace as necessary.)
Annually
Qualified personnel
—
POD SHUT DOWN REQUIRED
Calibrate (zero out) POD
differential pressure sensors.
(Investigate discrepancies, trouble
shoot, and replace as necessary.)
Annually
Qualified personnel
Lighting
Visual inspection of lighting
fixtures and lamps. Replace
components upon failure.
As needed or
Quarterly
Licensed electrician/
Qualified personnel
Fire alarm and suppression system
Component to be inspected
Task
Frequency
Capable Party
Full system functional check
Inspect and perform a functional
check of the system.
As required by
local code
Authorized technician
Fire panel
Inspect and test fire panel
battery backup system.
Bi-annually
Authorized technician
VESDA
Inspect and test VESDA power
supply.
Quarterly
Authorized technician
—
Inspect the VESDA pipe
network.
Bi-annually
Authorized technician
—
Inspect the VESDA filter.
Replace as necessary.
Annually
Authorized technician
—
Conduct a VESDA pipe integrity
smoke test.
Annually
Authorized technician
—
Check the VESDA pipe flow.
Annually
Authorized technician
—
Clean the VESDA sampling
points.
Every 2 years
Authorized technician
—
Flush the VESDA pipe network. Every 2 years
Authorized technician
—
VESDA system air
sampling/smoke test
As required by
local code
Authorized technician
Suppression system
Suppression system test
As required by
local code
Authorized technician
—
Fire-pull visual and operational
inspection
As required by
local code
Authorized technician
—
Fire strobe and horn visual and
operational inspection
As required by
local code
Authorized technician
HP POD 20c structure
Component to be inspected
Task
Frequency
Capable Party
Complete structure
Visually inspect the structural
integrity.
Annually
Qualified personnel