Hardware options installation 76
Removing the server rails
1.
Release the snap while pressing the rail against the side of the chassis and slide the chassis toward
the rear of the server, lining up the keys with the larger keyholes.
2.
Remove the rail from the server.
3.
Repeat steps 1 and 2 for the other rail.
Installing the tower cover
1.
Remove the rack bezel (rack servers only).
2.
Place the tower cover onto the unit and slide it toward the front of the server.
3.
Be sure the metal hooks on the inside of the cover engage with the chassis. There are five per side
for a total of ten.
4.
Using a T-15 Torx screwdriver, attach the two T-15 screws (in the back) to secure the tower cover to
the server.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...