Hardware options installation 71
ROM-based diagnostics
1.
Power up the server (on page
27
).
2.
Press the
F10
key, when prompted, to enter the System Maintenance menu.
3.
Select
Diagnostics.
4.
Run the
Memory Diagnostics.
5.
After the memory has been tested, exit the utility and reboot.
6.
Select the AMP mode ("
Selecting the AMP mode
" on page
71
).
Selecting the AMP mode
1.
Upon reboot, press the
F9
key, when prompted, to enter RBSU.
2.
Select
System Options.
3.
Select
Advanced Memory Protection.
4.
Select the desired memory mode.
•
Advanced ECC (hot-add enabled)
•
Advanced ECC (hot-add disabled)
•
Online Spare Memory with Advanced ECC
•
Hot-Plug Mirrored Memory with Advanced ECC
•
Hot-Plug RAID Memory with Advanced ECC
5.
Press the
Escape
key twice to go back to the main RBSU menu.
6.
Press the
F10
key, when prompted, to exit RBSU. The server reboots and tests all memory in the
system.
IMPORTANT:
To reconfigure the memory mode after initial setup, you must reboot the system, enter RBSU,
and select an AMP mode.
Tower-to-rack conversion
The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a
rack model server, and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
•
Rack rail assemblies
•
Server rails
•
Cable management arm bracket
•
Cable management arm support bracket (screw retaining plate)
•
Installation screws
•
Cable management arm
•
Rack bezel assembly
•
Tower-to-rack conversion installation instructions document
In addition to the items supplied in the conversion kit, the following items are also needed:
•
Torx T-15 screwdriver (clipped to the rear panel of the server)
Before proceeding with the tower-to-rack conversion:
1.
Power down the server (on page
27
).
2.
Remove all power supply cables from the server.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...