Server setup 37
Setting up a tower server
Follow these steps to set up a tower model server. If you are going to install the server into a rack, refer to
the rack installation section ("
Installing the server into the rack
" on page
37
).
1.
Connect peripheral devices to the server.
WARNING: To reduce the risk of electric shock, fire, or damage to the equipment, do not
plug telephone or telecommunications connectors into RJ-45 connectors.
IMPORTANT:
If the RILOE II board is installed in the server, be sure that you attach the video cable to the
video connector on the rear of the RILOE II board. The standard video connector on the server rear panel is
not used when the RILOE II board is installed. For more information, refer to the
HP Remote Insight Lights-Out
Edition II User Guide
.
2.
Connect the power cord to the power supply.
3.
Open the power cord retaining clip and thread the power cord through the retaining clip.
4.
Snap the tab into place to secure the power cord.
5.
Connect the power cord to the AC power source.
WARNING: To reduce the risk of electric shock or damage to the equipment:
•
Do not disable the power cord grounding plug. The grounding plug is an important
safety feature.
•
Plug the power cord into a grounded (earthed) electrical outlet that is easily
accessible at all times.
•
Unplug the power cord from the power supply to disconnect power to the equipment.
•
Do not route the power cord where it can be walked on or pinched by items placed
against it. Pay particular attention to the plug, electrical outlet, and the point where
the cord extends from the server.
Installing the server into the rack
Refer to the installation instructions that ship with the rack kit to install the server into the rack.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...