Hardware options installation 39
Hardware options installation
In this section
Preparing the server for options installation ............................................................................................... 39
Processor options ................................................................................................................................... 39
Hot-plug SCSI hard drive options ............................................................................................................. 44
Hot-plug SAS hard drive options .............................................................................................................. 45
Redundant hot-plug fans.......................................................................................................................... 47
Redundant hot-plug power supply ............................................................................................................ 49
Expansion boards .................................................................................................................................. 51
RILOE II board ....................................................................................................................................... 53
Optional drives ...................................................................................................................................... 53
Removable media devices ....................................................................................................................... 54
Memory options ..................................................................................................................................... 60
Tower-to-rack conversion ......................................................................................................................... 71
Rack-to-tower conversion ......................................................................................................................... 74
Battery .................................................................................................................................................. 78
Preparing the server for options installation
Most internal installation procedures involve either the system board or any of the four memory boards.
Installing components onto these boards may require the following common preparatory tasks:
1.
Power down the server (on page
27
).
2.
Unplug all AC power cords from the server.
3.
Remove the access panel ("
Access panel
" on page
31
).
If more than one option is being installed, read the installation instructions for all the hardware options
and identify similar steps to streamline the installation process.
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and
the internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
Processor options
The server supports up to four processors. With two or more processors installed, the server supports boot
functions through the processor installed in processor socket 1.
Server PPMs provide the proper power to each processor. Each PPM must be installed in the slot adjacent
to its processor.
CAUTION:
To prevent thermal instability and damage to the server, do not separate the processor from the
heatsink. The processor, heatsink, and retaining clip make up a single assembly.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...