Hardware options installation 55
Removing the tape drive blank
1.
Unlock and open the tower bezel ("
Unlocking and removing the tower bezel
" on page
29
) (tower
servers only).
CAUTION:
Always populate each media bay with either a device or a blank. Proper airflow can only be
maintained when the bays are populated. Unpopulated drive bays can lead to improper cooling and
thermal damage.
2.
Pull the tape drive blank out of the chassis.
3.
Store the blank for later use.
Installing a tape drive
NOTE:
If you are installing a USB tape drive, you do not have to remove the system board. You can omit
steps 7, 8, and 10.
1.
Power down the server (on page
27
).
2.
Extend the server from the rack, if applicable ("
Extending the server from the rack
" on page
27
).
3.
Unlock and open the tower bezel ("
Unlocking and removing the tower bezel
" on page
29
) (tower
servers only).
4.
Remove the access panel ("
Access panel
" on page
31
).
5.
Remove the processor air baffle ("
Processor options
" on page
39
).
6.
Remove all expansion boards ("
Expansion boards
" on page
51
).
7.
Remove all memory boards.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...