Hardware options installation 67
10.
Move the locking switch to the locked position.
NOTE:
In hot-plug procedures, all LEDs now turn off except the board status LED, which flashes green while
the board is rebuilding. This process may take several minutes.
11.
Observe the LEDs on the top of the memory board to be sure that the memory is functioning properly
("
Memory board LEDs and components
" on page
20
). The LED states will be valid when the memory
board has finished rebuilding.
12.
Replace the access panel ("
Access panel
" on page
31
).
13.
Reinstall the server into the rack (rack servers only) ("
Installing the server into the rack
" on page
37
).
Removing and installing a memory board (non-hot-plug)
1.
Extend the server from the rack, if applicable ("
Extending the server from the rack
" on page
27
).
2.
Remove the access panel ("
Access panel
" on page
31
).
3.
Determine which memory board is to be removed by locating the memory board that displays an
amber board status LED. Take note of the failed DIMM, if applicable.
4.
Power down the server (on page
27
).
5.
Unlock the memory board locking switch.
6.
Unlock and open the memory board ejector lever.
Содержание ML570 - ProLiant - G2
Страница 1: ...HP ProLiant ML570 Generation 3 Server User Guide February 2006 Fourth Edition Part Number 374178 004 ...
Страница 26: ...Server component identification 26 Status Green Operating normally Amber Failed Off No power ...
Страница 68: ...Hardware options installation 68 7 Remove the memory board and place on a flat surface ...
Страница 85: ...Server cabling 85 IMPORTANT Install the RILOE II board into slot 3 or 4 for ease of cabling ...
Страница 103: ...Troubleshooting 103 ...
Страница 127: ...Acronyms and abbreviations 127 WOL Wake on LAN ...