Hardware options installation 93
7.
If you intend to use an FBWC module, install the module on the storage controller. Depending on the
controller model, the cable connector on the cache module might be facing up or down when the
module is installed on the controller board.
a.
Connect the cache module backup power cable to the module.
b.
Install the cache module on the storage controller.
8.
If installed, remove the rear drive cage ("
9.
If installed, remove the six-bay SFF rear drive cage ("
10.
If an expansion board is installed on the PCI riser cage, remove the PCI riser cage (on page
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...