Hardware options installation 56
o
SFF drive
4.
Determine the status of the drive from the drive LED definitions ("
5.
Slide the front drive cages into the chassis (on page
To configure arrays, see the
HPE Smart Storage Administrator User Guide
on the Hewlett Packard
Enterprise website (
http://www.hpe.com/info/smartstorage/docs
Installing a hot-plug drive in the rear drive cage
CAUTION:
Do not operate the server with any of the rear drive bays empty. To maintain
proper airflow and sufficient cooling in the rear drive cage, all drive bays in this cage should
have a drive or a drive blank. Hewlett Packard Enterprise recommends installing at least one
drive in the rear drive cage before operating the server.
To install the component:
1.
Access the product rear panel.
2.
Remove the drive blank:
o
LFF drive blank
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...